Table of Contents

Simchair MKIV collective lever base classic

hc625ma.org_wp-content_uploads_2019_07_img_20190705_112425.jpg hc625ma.org_wp-content_uploads_2019_07_img_20190705_112438.jpg

Components

Repository path

simchair4_models\printable components\peripherals\helicopter\collective lever\a_base - models
simchair4_software\peripherals - choose the preferred variant of the lever - software

Assembly Guide

1. Insert SS495A1 into its socket in the top part of the lever frame (use a drop of super glue to fix it there) and solder its wires. Route wires as shown on the 3rd picture, use some glue as necessary.
hc625ma.org_wp-content_uploads_2019_07_15621623810965338907647298137893.jpg hc625ma.org_wp-content_uploads_2019_07_15621625726435977825299914770445.jpg hc625ma.org_wp-content_uploads_2019_07_15621630944731646288145590558678.jpg


2. Cut off a piece of 10mm square aluminum profile. Choose the length depending on the lever you want to build (as stated in the lever body manual, e.g. 200mm for a single throttle lever)
hc625ma.org_wp-content_uploads_2019_07_15621646712677532393488104139149.jpg


3. Put the lever connector part onto the rail.
hc625ma.org_wp-content_uploads_2019_07_15621647541888750802542128064602.jpg


4. Drill a 3mm hole through the rail and insert an M3x20mm screw with a nyloc nut.
hc625ma.org_wp-content_uploads_2019_07_15621649112653691871033377973474.jpg


5. Use a 5,5mm drillbit, to make a 6mm hole for the axis through the rail.
hc625ma.org_wp-content_uploads_2019_07_15621653646002757359840547887392.jpg


6. We will be assembling the lever axis: Start with putting an M6x8x18mm hub on a M6x70mm bolt.
hc625ma.org_wp-content_uploads_2019_07_15621637378018421333394337664354.jpg


7. Put 3 M8 washers onto the hub.
hc625ma.org_wp-content_uploads_2019_07_15621637939975931872903650513261.jpg


8. Put 2 bearings onto the hub.
hc625ma.org_wp-content_uploads_2019_07_15621639759544702930318930238678.jpg


9. Put a reinforced M6 washer onto the bolt
hc625ma.org_wp-content_uploads_2019_07_15621642402968440300197695975340.jpg


10. Put the axis though the lever connector part (orientation is important!)
hc625ma.org_wp-content_uploads_2019_07_15621655001942847367003318010919.jpg


11. Put a reinforced nut onto the M6 bolt.
hc625ma.org_wp-content_uploads_2019_07_15621656024725412464630054854885.jpg


12. Put another hub onto the bolt.
hc625ma.org_wp-content_uploads_2019_07_15621656614566478588993330800541.jpg


13. Put 2 bearings onto the hub:
hc625ma.org_wp-content_uploads_2019_07_15621658374131857828914486505264.jpg


14. Add 3 M8 washers:
hc625ma.org_wp-content_uploads_2019_07_15621658862981280316395680193177.jpg


15. Put an M6 washer and a nut onto the bolt. Use few drops of thread locker, to secure the nut in place.
hc625ma.org_wp-content_uploads_2019_07_15621662035493535529497364607651.jpg


16. Put the magnet onto the nut and fix it with hot glue.
hc625ma.org_wp-content_uploads_2019_07_15621664363831955935683107240972.jpg hc625ma.org_wp-content_uploads_2019_07_15621667311605039704775676870956.jpg


17. Insert the axis assembly into it's frame.
hc625ma.org_wp-content_uploads_2019_07_15621668167667064869085216128462.jpg hc625ma.org_wp-content_uploads_2019_07_15621669312062702627378605380130.jpg


18. Insert 4 M4x40mm bolts into the frame, as shown in the picture below. Put nuts from the other side, use thread locker.
hc625ma.org_wp-content_uploads_2019_07_15621669312062702627378605380130.jpg hc625ma.org_wp-content_uploads_2019_07_15621748278558329333645938840040.jpg


19. Insert 4 M4x70mm screws into the frame as shown in the picture below, add nuts, use thread locker.
hc625ma.org_wp-content_uploads_2019_07_15621749242278897364169073582920.jpg hc625ma.org_wp-content_uploads_2019_07_1562175353905343837818269533276.jpg


20. Put the curtain part on. Fix it with 2 M4x40mm screws, add nuts and use thread locker. Congrats! The axis assembly is finished!
hc625ma.org_wp-content_uploads_2019_07_15621754455938333391775818416321.jpg hc625ma.org_wp-content_uploads_2019_07_1562175791397773424619512397395.jpg


21. Insert axis assembly into the housing. Fix with nuts, use thread locker.
hc625ma.org_wp-content_uploads_2019_07_15621764338573449037514877989173.jpg hc625ma.org_wp-content_uploads_2019_07_15621764726425652247435483043078.jpg


22. Next we put the friction tensioner together. To do this, widen the holes in the left part with a PH0 3mm screwdriver or a drill. Insert 4 M3x50mm screws into it. After that, connect the right part of the tensioner and put nyloc nuts on. Do not tighten too much.
hc625ma.org_wp-content_uploads_2019_07_15621771123685096236084375500057.jpg hc625ma.org_wp-content_uploads_2019_07_15621774233888825845289689012377.jpg


23. Attach the tensioner to the lever housing. Add and tighten 4 M4 nuts, so there will be some clearance between them, and the tensioner.


24. Remove 2 pins (A2, A3) from the header. Only remove A3 if you will be making a twin lever.
hc625ma.org_wp-content_uploads_2019_07_15622416551641508462054848221423.jpg


25. Solder headers to the Pro Mini board. Wash the board after that with something like Fairy. Use neutral flux! If you’re short of pins, just use some spare ones to populate A4 and A5, like ones from pins 8 and 9 of Pro Mini.
hc625ma.org_wp-content_uploads_2019_07_1562241704716525276999436854551.jpg


26. Bend RST and GND pins, as shown in the picture below:
hc625ma.org_wp-content_uploads_2019_07_15622424617022753564565671049570.jpg


27. Insert the board into the Lid socket. The bent reset pins should point towards the button socket in the lid.
hc625ma.org_wp-content_uploads_2019_07_15622426704412124080604411583900.jpg


28. Solder the wires to a 17mm button. Break the unused pins off. Press-fit the button into its socket, secure it in it's place with hot glue.
hc625ma.org_wp-content_uploads_2019_07_15622427648115637994553008767460.jpg hc625ma.org_wp-content_uploads_2019_07_1562242987745207794672045662731.jpg hc625ma.org_wp-content_uploads_2019_07_15622431798338682848552425019257.jpg hc625ma.org_wp-content_uploads_2019_07_15622434642485126329260175499509.jpg


29. Solder 7-wire cables to 2 Ethernet sockets, and press-fit them into the lid. It's best to make a cable tie and only solder a separate cable to the board so wires won't get loose and touch each other with time. Make sure you have all your VCC, GND, SCL, SDA, etc wires connected in ties and only solder 1 wire from each tie to the board for best results.
hc625ma.org_wp-content_uploads_2019_07_15622443664511173110012898373857.jpg


30. Solder wires from pins 5,6,7 of sockets to Rx, Tx, DTR pins of the board. Pay attention to cable management, and it will help you a lot!
rj45-pin-numbers.jpg

PIN5 -> Rx
PIN6 -> Tx
PIN7 -> DTR

hc625ma.org_wp-content_uploads_2019_07_15622447963579198439391455829393.jpg hc625ma.org_wp-content_uploads_2019_07_15622452733241440425178470616604.jpg


31. Add one more piece of 4-wire i2c cable and make an I2C cable tie. Don’t forget to add an I2C cable for the head, if needed!
hc625ma.org_wp-content_uploads_2019_07_15622456889856711225680171653276.jpg hc625ma.org_wp-content_uploads_2019_07_15622458262531234308961645604878.jpg hc625ma.org_wp-content_uploads_2019_07_15622460005009037198790924623660.jpg


32. Connect the I2C cable to VCC,GND,SCL(A5),SDA(A4) as follows:
rj45-pin-numbers.jpg

PIN1 -> VCC
PIN2 -> GND
PIN3 ->SCL (A5)
PIN4 -> SDA(A4)

hc625ma.org_wp-content_uploads_2019_07_15622460864528809517621917146166.jpg hc625ma.org_wp-content_uploads_2019_07_15622466991834160676435414207670.jpg


33. Connect the left wire of the mode switch to pin 2, right one to pin 3, the middle one to GND next to RST pin.
hc625ma.org_wp-content_uploads_2019_07_15622485533348630180946809766602.jpg hc625ma.org_wp-content_uploads_2019_07_15622480329852659688269601369039.jpg


34. Solder SS495A1 cable to A0, VCC, and GND to VCC and GND on the UART header. Connect throttle pot to A1, VCC, and GND if one is present.
hc625ma.org_wp-content_uploads_2019_07_15622481664863210252537627529146.jpg


35. Here’s how the final assembly should look like:
hc625ma.org_wp-content_uploads_2019_07_img_20190701_233556.jpg

If everything looks correct, flash the board with it's firmware, using FT232TL based adapter (or any other) and a UART- Ethernet cable connected as follows:
hc625ma.org_wp-content_uploads_2019_07_rj-45-pinout-t-568b-pin-diagram.jpg

Next we will need to calibrate the lever. To do this, uncomment

#define CALIBRATE

and comment out map functions:

//z = map(z,0,936,0,1023);
//rz = map(rz,32,1023,1023,0);

Then,


36. After you have finished assembling the lever body, attach the lid to the housing. Fix with in place with 4 M8x70 or M8x75mm bolts and nuts.
hc625ma.org_wp-content_uploads_2019_07_15622505952084137052247862091447.jpg hc625ma.org_wp-content_uploads_2019_07_1562250637094953621770216798105.jpg


37. Add the remaining parts of the housing: pneumatics mount and side covers. Congratulations, your base is finished!
hc625ma.org_wp-content_uploads_2019_07_img_20190705_112438.jpg hc625ma.org_wp-content_uploads_2019_07_img_20190705_112425.jpg